Page 8 from 11.
...the cycle times have been reduced by 70% to 80% - sometimes even reduced by 90%
..a part from customer that took him 7 hours and 30 minutes to manufacture, we did it in iMachining in 2 hours and 50 minutes
..we can now use iMachining, which we find to be really great technology.
..milled the same part with a higher iMachining level, and we reduced the machining time to 4 1/2 mins , as opposed to 17 mins
..task to achieve much longer tool life...iMachining results: 2 min cutting time (50% saving)..12 slots milled per tool - tool like new!
...iMachining as usual fascinated the attendees and has exceeded all expectations!
...success was great for both - after the event we showed both that the Iscar tools had low wear and the excellent results of the of mold machining.
..iMachining time 17 min vs Competitor CAM time of 1 hr 45 min..
....Rubber mold (automotive component)...steel EN31
...We have been running an aluminum pocketing job for 15 years. The run time has been 22 minutes. The job now runs in iMachining in 9 minutes...